Pettis Avenue

Back

10 foot minimum width HMA trail on the West side of Pettis at Cannonsburg, includes a midblock crossing and then travels on the east side of Pettis down to Knapp Street. This project includes drainage improvements, retaining wall, and a pedestrian bridge (or 2).  Traffic control will consist of intermittent and moving lane closures at times, there may be a full closure for a small duration as they set a pedestrian bridge over Egypt Creek.