Install (2) residential sanitary sewer laterals by open-cut excavation methods and tie into the existing sanitary sewer main at the centerline of 3 Mile Road. Work in the right-of-way will also include two water services and water main taps on the north side of 3 Mile Rd outside the influence of the road.