Work is expected to begin at Cascade Bridge No. 1 with work subsequently beginning at Ada No. 37. The scope at each bridge involves minor concrete repair, expansion joint work, waterproofing, and epoxy overlay. Both projects will be completed using temporary traffic signals to provide 2-way traffic at all times.
*Please note, after a 28-day curing period for the concrete work, the temporary traffic signals will be redeployed and the epoxy overlay work will take place. This work should take approximately 1 week to complete.