68th Street

Back

This is phase two of a two-phase project.

 

This phase involves road reconstruction and widening (KCRC) as well as non-motorized pathway construction on the north side of 68th Street (Caledonia Township). Work will include asphalt removal, earthwork, drainage, stump removal, culvert replacement, asphalt pavement, pavement markings and restoration.

 

68th Street will be closed to through traffic between Kraft Ave to Cherry Valley Ave. Access to businesses and residences will be maintained at all times.