West River Dr (Plainfield Bridge #25)

Back

Preventive maintenance includes substructure repair, joint gland replacement, water repellent, epoxy overlay on deck, and pavement markings.  This project will be completed under lane closures. Two-way traffic will be maintained. Delays possible.