The Kent County Road Commission in collaboration with Cascade Township is contracting with Rieth-
Riley to complete a full-width repaving of select local streets. The project is to be completed within 2025 contract limits.
For more information, click the link below:
Neighborhood Paving Guide for Property Owners
List of Streets PROJECTED START 9/15 (Schedule subject to change)
-Oak Terrace Court: Woodbrook Drive to End
-Ridgemont Court: Woodbrook Dr to End
-Sandy Lane Court: Sandy Lane Drive to End
-Sandy Lane Drive: Woodbrook Drive to End
-Tricklewood Drive: Woodbrook Dr. to Tricklewood Ct
-Woodbrook Drive: Burger Drive to End
PAVING COMPLETE - RESTORATION IN PROGRESS
List of Streets COMPLETED (5/14)
Brookhills Court: Thornapple River to End
Brookpoint Drive: Tanglewood Dr. to Brookhills Ct.
Cimarron Drive: Burger Dr. to Tuscany Dr.
Mistylane Court: Tanglewood Drive to End
Tanglewood Drive: Thornapple River to Burger Dr.
Tricklewood Court: Tricklewood Drive to End
Tricklewood Drive: Brookhills Ct to Tricklewood Ct
Tripoli Court: Tripoli St. to End
Tripoli Street: Burger Dr. to Tuscany Dr
Tuscany Drive: Burger Dr. to End
Winterberry Court: Tanglewood Drive to End
List of Streets COMPLETED (6/3)
Buttrick Avenue: 28th Street to Whitneyville Ave
Restoration: Upon completion of the project, grass in the right-of-way will be restored by KCRC within approximately two-to-four weeks. Topsoil and grass seed will be placed in disturbed areas. It is the homeowner’s responsibility to water and maintain the area to assist with regrowth.