The Kent County Road Commission (KCRC) in collaboration with Grand Rapids Township is contracting with Black Gold Transport, Inc. to complete a full-width repaving of select local streets. The project is to be completed within 2025 contract limits.
About the Project: The resurfacing project will consist of repaving with hot mix asphalt the entire road surface of the identified streets.
For more information, click the link below:
Neighborhood Paving Guidance for Property Owners
List of Streets PROJECTED START 10/1 (Schedule subject to change)
Maryland Avenue: Fulton St. to Robinson Rd.
Woodward Lane: Robinson Rd. to Sunny Brook Ave
Bradford Street: Crahen Avenue to End
PAVING COMPLETE - RESTORATION IN PROGRESS
List of Streets COMPLETED (6/9)
Brandau Avenue: 4 Mile Rd. to Kreft St.
Kreft Street: Brandau Ave. to End
Hall Street: Forest Hills Ave. to Paterson Ave
Oakcliff Drive: Rupert St. to Lamberton Lake Dr.
Alson Drive: 3 Mile Rd. to Sundrel Dr.
Sandrel Drive: Alson Dr. to Aldale Dr.
Aldale Drive: 3 Mile Rd. to Sundrel Dr
East Sandrel Court: Sandrel Drive to End
West Sandrel Court: Sandrel Drive to End
Fox Ridge Drive: Dean Lake Ave. to Indian Ridge Dr
Indian Ridge Drive: East & West of Fox Ridge Dr.
Burgen Court: Burgen Avenue to End
Lenwood Court: Burgen Avenue to End
Winesap Court: Winesap Dr. to End
Burgen Avenue: 3 mile Rd. to Curtice Wood Dr.
Winesap Drive: Leffingwell Ave. to End
Florlen Avenue: Winesap Dr. to Curtice Wood Dr.
Curtice Wood Drive: Florlen Ave. to Winesap Dr.
Beatrice Drive: Dean Lake Ave. to End
Tradition Drive: Dean Lake Ave. to Beatrice Dr.
Restoration: Upon completion of the project, grass in the right-of-way will be restored by KCRC within approximately two-to-four weeks. Topsoil and grass seed will be placed in disturbed areas. It is the homeowner’s responsibility to water and maintain the area to assist with regrowth.