The Kent County Road Commission (KCRC) in collaboration with Cannon Township is contracting with Michigan Paving and Materials to complete a full-width repaving of select local streets. The project is to be completed within 2025 contract limits, projected to start early June, weather permitting.
About the Project: The resurfacing project will consist of repaving with hot mix asphalt the entire road surface of the identified streets.
For more information, click the link below:
Neighborhood Paving Guidance for Property Owners
List of Streets PROJECTED START 10/15 (Schedule subject to change)
Eldred Drive: Yound Avenue to East
Eldred Avenue: Southerly to Backaround
Eldred Avenue: Northerly to Cul-de-sac
PAVING COMPLETE - RESTORATION IN PROGRESS
List of Streets COMPLETED (6/6)
-Davies Drive: Ramsdell Drive to End
-Goldenrod Drive: Davies Drive to Ramsdell Drive
-Northport Drive: 9 Mile Road to End
List of Streets COMPLETED (8/7)
Blakely Drive: Cannonsburg Road to 7 Mile Road
Restoration: Upon completion of the project, grass in the right-of-way will be restored by KCRC within approximately two-to-four weeks. Topsoil and grass seed will be placed in disturbed areas. It is the homeowner’s responsibility to water and maintain the area to assist with regrowth.