Project involves a 5.0-inch partial-depth mill and fill. The work also includes spot curb and gutter replacement,
sidewalk ramp upgrades, and permanent pavement markings. The road will be closed to through Traffic and
open to local traffic with a posted detour via Ada Drive – Spaulding – Fulton (M-21). Grand Rapids Township will also
be performing a concurrent resurfacing project on the parallel non-motorized pathway under a separate contract.