The project will consist of cold milling the existing roadway, followed by the placement of two courses of hot mix asphalt (HMA) and the installation of permanent pavement markings.
The roadway will be closed to through traffic during construction but will remain accessible to all businesses and residents within the project limits.
Emergency Vehicles and buses can pass. Local traffic to properties within the work zone maintained.